Metro Redline Station, Los Angeles, California

Electrical Construction Services

Owner
Metro Transit Authority

Architect
DMJM/PBQD/DE/HWA,J.V.

Engineer
E.M.C.

Construction Manager
Parsons-Dillingham

General Contractor
Tutor-Saliba-Perini

Project Duration
15 months

Electrical Services Project Description:

The Metro Redline, B211 Wilshire/Vermont Station consists of an impressive three-story underground station, 120 feet deep and 600 feet long. The Vermont Station is the transfer/junction point for the Wilshire Corridor and the Hollywood line. Dynalectric Los Angeles did the embedded conduit in this phased commercial electrical construction project.