San Joaquin Hills Transportation Corridor, Orange County, California

Electrical Construction Design-Build-Assist Services

Owner
Transportation Corridor Authority

Engineer
E.M.C.

Construction Manager
Parsons DeLeuw

General Contractor
California Corridor Constructors

Project Duration
48 months

 

Electrical Design-Build-Assist Services Project Description:

After months of lawsuits, injunctions and demonstrations, California Corridor Constructors (Kiewit-Granite Joint Venture) cut a new path through Orange County that connects the South County to the Newport/Irvine Airport area.

Dynalectric LA's involvement on this 18-mile toll road included design-build-assist services on all aspects of electrical construction including the Corridor Operating System C.O.S., counting stations, tollbooths, ramp metering systems, CCTV and surveillance systems, and toll plaza.

New electrical construction services included 500 roadway street lights, 35 traffic intersections/signals and 15 miles of backbone system for the C.O.S. that will control over 100,000 cars per day in the future.